The major columns for the south glazing wall are up. The header is nearly finished, and we are waiting on lumber to start framing the bedroom walls. We also put up the ledger beam for the roof joists. The ledger beam is attached to the "Flex-crete" with big lag bolts. The angle of the ledger beam gives you a good idea of the form of the roof on this section of the house.
Tristan (T1T2)