DesignBuildBLUFF

To learn more about DBB check us out at www.DesignBuildBLUFF.org

Saturday, February 03, 2007

Tire wall status: completed.
Formwork status: ready for concrete next week.
Plumbing status: completed.
Readiness for weekend Sunday break status: affirmative.

Mug shots from inside Mumzie.

The Baxter.

Trenches ready for the plumbing.




Tires are the latest fashion accessory, as modeled by the lovely Lindsay.



Sexy tire wall.

Double hotness: railroad tie stairs and Ryan.


It's all in a day's work.
The newest addition to our blog: the "feature feast". Each night, I'll picture images of the dinners that we concoct and consume. As pictured above, our debut "feature feast" was a Japanese masterpiece! For our gastronomic enjoyment (and working from the top of the plate counterclockwise), we had a hot and flavorful stir-fry of tender chicken, onions, and potatoes. This was accompanied by a simple rice dish, garnished with tiny broccoli florets and topped with scrambled egg and seaweed. To round off our meal, our taste buds were tantalized by a delectably delicious and complementary cabbage, carrot, and beet salad, delicately drizzled with a subtle balsamic vinaigrette and tossed with candied walnuts. We may be students but we don't mess around with dinners down here.

Labels:

2 Comments:

  • At 6:38 PM, Anonymous Anonymous said…

    this isnt a comment, but are the walls going to be made of tires with just a plaster over it, like are the walls just going to be tire walls?

     
  • At 10:48 PM, Blogger Camille Wheatley said…

    The retaining walls will be plastered since they'll be withstanding the elements, and we'd like them to last as long as possible. We'll plaster them with some sort of earth or lime plaster.

     

Post a Comment

<< Home